ONEWALL CELLULAR AGGREGATE PANEL INSTALLATION DIAGRAMS

Onewall Cellular Aggregate Panel – Cross Connection:

cross connection diagram

Onewall Cellular Aggregate Panel to Panel Connection:

panel to panel diagram

Onewall Cellular Aggregate Panel – Between Structural Walls or Column:

structural wall diagram

Onewall Cellular Aggregate Panel - T Connection:

panel - T diagram

Onewall Cellular Aggregate Panel – Right Angle Connection:

Onewall Cellular Aggregate Panel – Right Angle Connection:

Onewall Cellular Aggregate Panel – Connected to Beams or Panel:

diagram

Onewall Cellular Aggregate Panel and Ground:

Onewall Cellular Aggregate Panels – Connected to Steel Beams:

Onewall Cellular Aggregate Panels – Connected to Steel Beams:

diagram

Expansion Bolt for Steel Hanging Mount:

diagram

Electric Wire Pile Installation:

Keyway & Groove for Conduits and Junctions

Creating a keyway with a held electric saw for the installation of a concealed wire and switch box, then filling with polymer mortar after installation.

keyway guide

Anti-Cracking Tape (Mesh) – after grouting is completed wait 3 to 5 days before applying anti-crack tape or fibre mesh. Second coats may be required to achieve a smooth joint before applying the finishing coat.

Shop drawing guide

Three (3) Meter Wall Height

Four (4) Meter Wall Height

Six (6) Meter Wall Height

6 wall diagram